cost per item, total cost, training, maintenance, and any other costs associated with the
implementation and support of the AIT system. Values should be in cost per year.
6) Alternative Economic Analysis: Finally, the last step is to consider net present worth
calculations based on some marginal attractive rate of return and return on investment
calculations of the alternatives
The Tool: A Framework for Calculating the Value of AITs in Depot
Operations
Once a reasonably accurate mapping of depot operations has been completed, the next step is to
create a framework to calculate the value of AIT alternatives for Tinker’s operations. The
framework should be capable of determining the value of each alternative as well as consider the
points at which the AIT should be applied in Tinker’s processes and how the to apply the
specific AIT. Based on research, the following operations are targets for this economic analysis:
Return process
Exchange process
Ordering process
Item Relocation process
Warranty Savings
Inventory Accuracy
The framework is a tool for determining the value of these alternatives. However, it is based on
some assumptions. One assumption in this analysis is that the Tinker will incur the cost for
tagging items. In reality, this cost may be passed onto the supplier for orders due to the DoD
mandate. Scenarios in which suppliers or repair vendors incur the cost of tagging is not
considered in the analysis. Below is an example of how the framework can be used to determine